Basic Info.
Product Description
High Speed Aluminum Roofing Step Tile Roll Forming Machine
Profile:
The chart of process flow:
1.Technical parameters
The main technical parameters are for your inference only.
Only if you provide the profile required or the real objects of sectional materials, and we will offer the accurate parameters.
(1) 5Tons manual un-coiler | |
Description | There are different choices, please turn to the catalogue of un-coiler |
(2) Entry bench & Manual Pre-shearing device | |
Function | Smart cut control, to cut off the end of the final piece of sheet only |
Shearing Thickness | Up to Max. 0.8mm (if thickness > 0.8mm, then hydraulic pre-shearing device or electric pre-shearing device instead ) |
(3) The general machine parameter | |
Suitable roll forming material | Color steel sheet or Aluminum |
Thickness | 0.4mm-0.6mm |
Feeding width | 1220mm |
Frame design | Wall-plate-frame-design /New-stand-frame-design |
Roll stages | 18 stages |
Material of forming roller | 45# steel, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75 mm |
Main motor power | 7.5KW with reducer |
Max. Line speed of roll former | Approx. 4m/min (stair length 350mm, production length 6m) |
Hydraulic Stair-Drawing & Cutting Device | There is one hydraulic press to make the stair according to requirement and hydraulic post cut for cut off |
Hydraulic group power | 11KW |
Material of cutting blade | Cr12, heat treatment |
Electric Standard | 380V /50Hz/3PH or as the customer's requirements |
Machine Dimensions | 8560mm×1970mm×1610mm |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customer's requirements |
(4) PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Encoder | Omron brand |
(5) Product rack | |
Description | un-powered, 3 units |
(6) Options for tile roof : A.Hydraulic pre-shearing device B.Improvement for driving system for Tile roof Servo motor instead of AC motor for the roll former, to increase the production speed and the tolerance between two stairs Driving system with gear box and redirector for every three/four stages to improve the speed and tolerance control. Sprocket driving between each three/four stages. | |
(7) Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excluding the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. | |
(8) About us | |
Please visit the web site: liming2018.en.made-in-china.com for detailed information |
Below pictures for your reference only
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.