Basic Info.
Product Description
COLD ROLLING MILLS FOR U PURLINE
Profile:
The chart of process flow:
1.Technical parameters
The main technical parameters are for your inference only.
Only if you provide the profile required or the real objects of sectional materials, and we will offer the accurate parameters.
(1) 5Tons un-coiler | |
Description | There are different choices, please turn to the catalogue of un-coiler |
(2) The general machine parameter | |
Suitable roll forming material | Galvanized steel sheet or Ex cold rolled sheet |
Thickness | 1.5-2.4mm |
Frame design | Wall-plate-frame-design /Strong-stand-frame-design |
Roll stages | 14 stages |
Material of forming roller | GCr15, CNC lathes, Hard Chrome Coated |
Shafts Diameter | Φ75mm |
Main motor power | 18.5KW, Frequency speed control |
Max. Line speed of roll former | 7-10m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power | 15KW |
Material of cutting blade | Cr12, heat treatment |
Electric Standard | 380V /50Hz/3PH or as per customers' requirements |
Machine Dimensions | 11760mm×1980mm×1630mm (estimated only) |
Major Color of Machine Painted | RAL 5015 (Blue) or as per customers' requirements |
(3) PLC Control system | |
PLC | Siemens brand (ABB brand is available if required) |
Touch Screen | Siemens brand (ABB brand is available if required) |
Inverter | Schneider brand (ABB brand is available if required) |
Encoder | Omron brand |
(4) Product rack | |
Description | Un-powered, 6 meters length |
(5) Option:
| |
(6) Service after sell | |
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. | |
(7) About us | |
Please visit the web site: liming2018.en.made-in-china.com for detailed information |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.